Elkwater Fork Construction Photos
July, 2007
 |
View looking across a roller compacted concrete (RCC) surface
towards the right abutment. The upstream liner wall, made of re-cast
concrete with plastic liner, is on the right. |
 |
View looking at the downstream face of the dam. Equipment shown
includes a crane for placing upstream liners wall panels and the crane
for placing RCC. |
 |
View looking at crane used to place RCC. Notice the boom is not
fully extended. A mass of concrete at the rear of the crane is used to
stabilize the crane when the boom is extended. |
August, 2007
 |
Upstream of the dam. Pipe shown is for temporary stream bypass. |
 |
Downstream face of dam. The steps dissipate energy in between the
training walls. |
 |
View looking down at the top of the dam prior to construction of the
overflow weir. Workers in the background are placing steel along the
training wall |
 |
View looking down at the downstream face of the dam. Workers are
placing reinforcing steel for the training wall. |
 |
View looking down at the downstream face of the dam. Workers are
placing reinforcing steel for the training wall. |
 |
View of dam site from the air |
 |